Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

David Rosario

Centreville

Summary

Knowledgeable Pipe Foreman with extensive experience gained from Independence Excavating, Allan Myers, and Shirley Contracting. Excelling in wet utility installation and site coordination. Proven ability to lead teams effectively while ensuring compliance with OSHA regulations. Skilled in blueprint analysis and county detail compliance.

Overview

6
6
years of professional experience
1
1
Certification

Work History

Pipe Foreman

Independence Excavating
09.2023 - 05.2025

Jobsites During Employment:

  • Stack NVA05A-HITT Data Center
  • Parkstone-EE Reed Data Center
  • VA3-HITT Data Center Campus
  • Carvers Creek-DEPCOM POWER 150MW Solar Farm
  • IAD 04/05-Whiting and Turner Data Center Campus

Summary of Tasks/Responsibilities

  • Coordinated with PEs, PMs, Superintendents, GC personnel, County Inspectors, and trade workers to align construction projects with drawings and specifications.
  • Supervised layout, assembly and installation of various sizes and types of pipes including: 4"-12" DIP Waterline/Forcemain, 6"-60" Storm/Dewatering Pipe, 8"-24" C900 Gravity Sanitary Pipe, and various configurations of Telecom and Power conduits.
  • Assembled and secured pipes, tubes, fittings and related equipment according to project and county specifications such as: Outside Drops, Line Anchors, Restraint Joint Pipe, and in-field vertical bend requirements for DIP.
  • Managed, oversaw, and responsible for the production, safety, and wellbeing of a crew consisting of 5 laborers and 2 operators.

Field Manager

Allan Myers
08.2020 - 09.2023

Jobsites During Employment

  • Arlington National Cemetery McPherson Road Repairs-USACE Project
  • Fort Belvoir-Dogue Creek Bridge-USACE Project
  • ARA2A-HITT Data Center
  • Woodleigh Chase-Brinkmann Apartment Complex
  • IAD214-Whiting and Turner Data Center
  • VA21-Whiting and Turner Data Center
  • Wiehle Ave W&OD Trail Improvements-VDOT Project
  • I-66 Expansion-FAM/VDOT Project

Summary of Tasks/Responsibilities

  • Coordinated with PEs, PMs, Superintendents, GC personnel, County Inspectors, and trade workers to align construction projects with drawings and specifications.
  • Supervised layout, assembly and installation of various sizes and types of pipes including: 4"-24" DIP Waterline/Forcemain, 6"-48" Storm/Dewatering Pipe, 8"-12" C900 Gravity Sanitary Pipe.
  • Assembled and secured pipes, tubes, fittings and related equipment according to project and county specifications such as: Outside Drops, Line Anchors, Restraint Joint Pipe, and in-field vertical bend requirements for DIP.
  • Managed, oversaw, and responsible for the production, safety, and wellbeing of a crew consisting of 3 laborers and 2 operators.

Project Engineer

Shirley Contracting Company
06.2019 - 08.2020

Jobsites During Employment:

  • I-66/Route 28 Bridges-FAM/VDOT Project
  • Route 7 Widening-VDOT Project

Education

Bachelor of Science - Civil And Environmental Engineering

Virginia Military Institute
Lexington, VA
05-2019

Skills

  • Pipe installation
  • Site coordination
  • Installation and maintenance
  • Team management
  • Excavation safety
  • Blueprint analysis
  • Underground utilities
  • OSHA regulations
  • Piping systems
  • System testing
  • Blueprint interpretation
  • Employee motivation
  • Leak detection

Certification

  • OSHA 30
  • First Aid/CPR

Timeline

Pipe Foreman

Independence Excavating
09.2023 - 05.2025

Field Manager

Allan Myers
08.2020 - 09.2023

Project Engineer

Shirley Contracting Company
06.2019 - 08.2020

Bachelor of Science - Civil And Environmental Engineering

Virginia Military Institute
David Rosario