Summary
Overview
Work History
Education
Skills
MILITARY SERVICE
Timeline
Generic

KIRK ALBRITTON

Woodbridge

Summary

IT and Low-Voltage Construction Project Manager with 15+ years of experience supporting healthcare, enterprise, and mission-critical environments. Proven expertise delivering hospital renovation and new-construction projects from early design through activation, including structured cabling, nurse call, security, AV, DAS, wireless, and connected medical technologies. Deep familiarity with Inova Health System environments, construction milestones, low-voltage standards, vendor coordination, and on-site construction support. RCDD and RTPM certified.

Overview

15
15
years of professional experience

Work History

Project Manager - Low Voltage & Technology Systems

Convergint Technologies
01.2022 - 01.2025
  • Provided full lifecycle project management for low-voltage and IT systems supporting renovation and new construction projects.
  • Collaborated with architects, engineers, owners, and vendors during design phases to ensure constructible, standards-compliant technology designs.
  • Reviewed drawings, specifications, RFIs, and submittals for structured cabling, security, AV, wireless, and DAS systems.
  • Managed project schedules, identified IT construction milestones, and coordinated low-voltage activities with general contractors and trades.
  • Developed and managed project budgets, tracked costs, and implemented corrective actions to maintain financial control.
  • Provided on-site construction support, validating pathways, device locations, and space readiness.
  • Ensured adherence to quality standards, healthcare best practices, and client-specific design requirements.

Project Manager - Data Center & IT Infrastructure

Power Solutions LLC
01.2020 - 01.2022
  • Led IT infrastructure projects with emphasis on structured cabling, network hardware, and data center environments.
  • Evaluated RFPs, RFQs, and construction documents to support accurate scoping and execution.
  • Coordinated vendors and internal teams to align technical solutions with project schedules and construction sequencing.
  • Supported integration of Cisco switches, network application servers, and enterprise IT equipment.
  • Developed budgets and scopes of work for IT and low-voltage systems.

IT Project Manager

APEX Systems / Inova Health System
01.2018 - 01.2020
  • Directly supported Inova Health System hospital facilities, overseeing IT and low-voltage construction activities.
  • Managed and evaluated low-voltage contractors to ensure compliance with healthcare standards and Inova requirements.
  • Participated in design coordination meetings, translating clinical and operational needs into technical solutions.
  • Supported integration and troubleshooting of healthcare technology systems including:
  • Nurse call systems
  • Infant protection (HUGS)
  • Security cameras and video management
  • CATV / 2?Band over twisted?pair cabling
  • DAS and wireless access points
  • Provided on?site support to resolve system and construction coordination issues.

Owner / Construction Supervisor

AlbraTron Consulting & Networking Services
01.2016 - 01.2018
  • Supervised quality control operations for low-voltage and fiber installations, ensuring compliance with industry and client standards.
  • Provided drawings and pathway layouts using Bluebeam for passive optical network (PON) and structured cabling systems.
  • Managed multiple concurrent construction projects across the Washington, DC metro area.
  • Coordinated field crews, addressed site conditions, and resolved property owner and contractor issues.
  • Served as on-call supervisor supporting emergency and after-hours construction activities.

Project Engineer / Director of Cabling Infrastructure

Evergreen Information Technologies Services Inc. - Laurel, MD
01.2013 - 01.2015
  • Led cabling infrastructure operations, customer delivery, and manufacturer partnerships.
  • Defined and implemented operational procedures supporting consistent, high-quality customer experiences.
  • Managed projects from initial design through installation and turnover.
  • Key Achievements - Designed and deployed the first GPON installation for the U.S. Department of Agriculture (Washington, DC). - Introduced integrated AV and conferencing solutions that reduced customer build-out costs by over 50%.

Project Manager

American Systems - Chantilly, VA
01.2010 - 01.2012
  • Managed scope, schedule, budget, and resources for technology and infrastructure projects.
  • Prepared scopes of work, bills of materials, drawings, and project documentation.
  • Ensured compliance with ISO 9001 quality standards and contractual requirements.
  • Coordinated schedules and deliverables with customer representatives.

Education

Skills

  • Healthcare Construction Project Management
  • Low-Voltage & IT Infrastructure Systems
  • Structured Cabling, Nurse Call, Security, AV
  • Design Review & Standards Compliance
  • Budget Development & Cost Control
  • Vendor & Contractor Coordination
  • RFIs, Submittals & Change Management
  • On-Site Construction Support & Pathway Validation
  • Stakeholder & Clinical User Coordination

MILITARY SERVICE

  • United States Marine Corps Reserve
  • Field Radio Operator | 1982 - 1986

Timeline

Project Manager - Low Voltage & Technology Systems

Convergint Technologies
01.2022 - 01.2025

Project Manager - Data Center & IT Infrastructure

Power Solutions LLC
01.2020 - 01.2022

IT Project Manager

APEX Systems / Inova Health System
01.2018 - 01.2020

Owner / Construction Supervisor

AlbraTron Consulting & Networking Services
01.2016 - 01.2018

Project Engineer / Director of Cabling Infrastructure

Evergreen Information Technologies Services Inc. - Laurel, MD
01.2013 - 01.2015

Project Manager

American Systems - Chantilly, VA
01.2010 - 01.2012

KIRK ALBRITTON