Qualified Field Superintendent proficient in Process piping operations, compliance and standard practices. Motivated professional with a hardworking attitude and 12 years of experience in the piping trade.
Overview
10
10
years of professional experience
1
1
Certification
Work History
Field Superintendent
Chewning and Wilmer
04.2025 - Current
Interpreted blueprints, specifications and schematics to complete accurate work.
Coordinated site operations in accordance with established timelines.
Directed projects according to schedule and quality demands.
Inspected equipment and tools used for safe operation.
Investigated and reported on accidents, injuries and near-miss incidents.
Created and implemented plans to maximize efficiency of workers.
Oversaw daily operations at site, keeping team production moving at optimal pace.
Journeyman Pipefitter
UA Local Union 10
05.2015 - Current
Perform installation, maintenance, and repair of pipes and pipe systems in industrial settings.
Assemble and install valves, fittings, flanges and other related components.
Read blueprints to determine the layout of each project.
Cut, thread and assemble various types of piping materials such as copper, steel or plastic.
Replace worn parts such as seals or gaskets in pumps or valves.
Conduct pressure tests on newly installed systems to ensure proper functioning before use by personnel or customers.
Follow safety protocols when working with hazardous materials such as acids or caustics.
Train new employees on safe practices when working with piping systems.
Shut off steam or other gases or liquids from pipes to conduct maintenance.
Projects worked on: Miller-Coors(Elkton, VA) Brunswick Power Station, Anheuser-Busch, Nabisco, West Rock, Dutch Gap Power Station
Journeyman Pipefitter
Chewning and Wilmer
06.2024 - 03.2025
Followed safe work practices, which included fall protection and personal protective equipment.
Fabricated, assembled, installed and maintained piping systems.
Performed tests to check quality of pipe and piping systems and make adjustments as necessary.
Installed new systems and connected piping to existing components by welding, bolting and threading.
Fabricated piping pieces and components in line with design specifications for each system.
Reviewed blueprints and project specifications to determine correct plumbing solutions.
Install double containment piping for chemical systems.
Field Superintendent
Total Facility Solutions
09.2020 - 05.2024
Managed day-to-day operations, including scheduling and supervising field personnel, resolving operational issues and ensuring safety compliance.
Coordinated materials delivery schedules with suppliers to maintain an efficient flow of resources on the job site.
Developed and maintained relationships with key stakeholders such as clients, contractors, vendors, suppliers and other team members.
Ensured that all work was performed according to blueprints, plans and specifications.
Monitored project progress against established milestones to identify potential delays or risks in a timely manner.
Participated in weekly meetings with the client's representatives to discuss project status updates.
Reviewed project blueprints and specifications to determine number of workers needed to complete jobs.
Assisted in troubleshooting problems during the construction process by providing solutions based on best practices.
Projects worked on: Merck HPV expansion(Elkton, VA) Merck HPV expansion(DUrham, NC) Pfizer(Sandford, NC) Phlow Pharmaceutical(Petersburg, VA) Fuji Films(Holly Springs, NC)
General Foreman
Southland Industries
12.2019 - 08.2020
Ensured safety protocols were followed and maintained by all personnel on site.
Directed the activities of subcontractors to ensure quality workmanship and adherence to contract specifications.
Performed inspections of completed work prior to acceptance by client or owner representative.
Resolved conflicts between workers regarding job assignments, methods, or deadlines.
Maintained accurate records of daily operations including time cards, production data logs.
Identified potential risks associated with each project before beginning work.
Documented labor hours, crew attendance and individual performance.
Tracked and reported units and labor hours prior to submission of timecards.
Managed workers at various experience levels in construction and restoration projects.
Inspected rigging and scaffolding for safety and reliability.