Summary
Overview
Work History
Education
Skills
Certification
Activities
Timeline
Generic

Travis Compher

Ruther Glen

Summary

Experienced with overseeing all phases of construction projects. Utilizes strong leadership and organizational skills to drive project success. Track record of effective communication and problem-solving to ensure project milestones are met.

Overview

8
8
years of professional experience
1
1
Certification

Work History

Project Manager

Wade Homes
11.2023 - Current
  • Provided guidance to team members regarding tasks assigned to the
  • Fixed skid steers, dozers, excavators, etc.
  • worked on sump pumps to provide water in areas when needed or pump water out where it wasn't needed
  • Created and implemented processes to ensure successful completion of projects
  • Built and established strong partnerships with teams, vendors and contractors
  • Prepared cost estimates for projects of varying sizes
  • Negotiated with project stakeholders or suppliers to obtain resources or materials
  • Identified project needs by reviewing project objectives and schedules
  • Conferred with project personnel to identify and resolve problems
  • Operated heavy machinery such as dozer, excavator, skid steer, and tractor
  • Drive to the store and pick up the proper materials needed for the contractors
  • Hauled machines such as skid steer, mini excavator, and tractors in pickup trucks
  • Draw out floor plans and estimate how much material would be needed for the task
  • Talked to contractors to make sure the task they are assigned goes as planned


  • 40+ hours a week

Electrical Apprentice

MC Dean
07.2022 - 11.2023
  • Ran cable trays for power distribution from main panels to branch circuits
  • Worked with a variety of materials, including copper wiring, aluminum wiring, and MC cables
  • Connected cables from service entrance to meters and main distribution panel boards
  • Pulled wires through conduit runs using fish tapes or pull strings when necessary
  • Inspected transformers and circuit breakers to identify any potential issues before they become Major problems
  • Used hand tools such as wire strippers, cutters to prepare wires for connections to boxes, terminals
  • Measured and prepared supplies for electrical tasks
  • Worked in a team based environment to accomplish projects
  • Maintained organization, cleanliness and safety in work areas
  • Operated hand and power tools and diagnostic equipment to complete various aspects of jobs
  • Followed relevant electrical and building codes for each job
  • Inspected existing wiring to identify short circuits
  • Keep work areas clean, neat and free of hazards
  • Verified measurements and made accurate cuts to avoid wasting materials on job sites
  • Pulled insulated wires or cables through conduits to complete circuits
  • Addressed and resolved worksite safety hazards to reduce risk
  • Trained workers to install, maintain and repair electrical equipment and fixtures
  • Reviewed blueprints to determine electrical components and wiring locations
  • Installed leads and connected cables to motors and equipment
  • Connected wires to circuit breakers, junction boxes, and components for commercial properties
  • Fabricated parts according to specifications using hand and power tools
  • 40+ hours a week

Laborer

Caroline of Virginia
10.2020 - 07.2022
  • Assembling water lines and sewer pipes
  • installed new plumbing for houses such as water lines and sewer pipe
  • Installed new light fixtures and outlets through houses
  • Replaced old electrical fixtures with new light fixtures
  • Poured new footers and foundations to build new construction homes
  • Installed floor trusses
  • Installed 2x6 and 2x4 walls according to the building plans
  • Fixed gutters and if needed to be replaced installed new ones properly
  • Executed wall construction based on architectural plans and precise measurements
  • Constructed a 12-foot retaining wall, ensuring compliance with required inspections and installing geo grid installation
  • Installed windows according to plans and put the proper nails and weather protection needed
  • Operated tractors such as farm tractor, roller, dozer, excavator, and loader
  • Operated zero turn mower and utilized weed eater for lawn maintenance
  • Assembled scaffolding around construction sites for use by laborers during high-rise
  • Lifted objects weighing up to 50 pounds without assistance when necessary
  • Applied paint to newly finished drywall walls
  • Used picks and shovels to dig, spread and level dirt and gravel
  • Cut materials into specific sizes for installation using tile cutters and power saws
  • When not operating a machine, I would use the proper hand signals to help them be safe and not do something they're not supposed to
  • Located pipes underground with proper tools to ensure they wouldn't get hit when digging with heavy equipment
  • 40+ hours a week

Laborer

Green River Enterprises
12.2018 - 10.2020
  • Replaced broken siding or damaged siding
  • Installed new siding on commercial buildings and residential houses
  • Framed unfinished basements and installing proper fire blocking
  • Preformed jack hammering concrete to run new sewer plumbing
  • Installed insulation into walls using blow guns or similar tools while adhering to safety guidelines
  • Installed plumbing fixtures, fixed leaks in water lines and sewer lines properly
  • Installed new plumbing for new construction following the code book
  • Installed new water heaters and making sure the plumbing and wiring wear done correctly and professionally
  • Painting ceilings, walls, around fixtures and making sure drop clothes wear down to keep a mess free floor or any surrounding objects clean from paint
  • worked with generators when there wasn't power in the area
  • Worked on generators when they wouldn't start such as disassembling and putting back together, and making sure they wear kept up to date on services
  • Worked on vehicles such as replacing
  • Organized tools, supplies, and equipment needed for specific jobs according to instructions provided by the supervisor
  • Operated various power tools such as drills and saws safely while following manufacturer's instructions
  • Worked with team members to ensure efficient workflow throughout the day
  • Cleaned work area after job completion ensuring all debris is properly disposed of
  • Completed a variety of physical labor tasks
  • Performed repetitive assembly tasks with hand and power tools and automated equipment
  • Cut materials into specific sizes for installation using power saws
  • Prepared items for transportation installing bracing, padding and strapping to prevent damage
  • Mixed, poured, and spread concrete, asphalt gravel and other materials
  • Displayed high standards for quality workmanship and routinely double-checked work
  • Performed demanding physical work over extended periods and modeled a positive attitude
  • Loaded materials and tools into vehicles and unloaded upon arrival at job sites
  • Utilized hammers, saws, squares, levels, and fastening devices to complete projects.
  • 40+ hours a week

Grocery Stocker

Giant Food Stores
10.2016 - 12.2018
  • Restocked shelves after each customer purchase for optimal display presentation
  • Reported any damaged goods or out-of-date items immediately to management personnel
  • Inspected product quality and quantity before restocking shelves with new items
  • Rotated and faced product displays for optimal visual appeal
  • Checked expiration dates on perishable items to guarantee freshness
  • Built promotional displays for featured products in accordance with corporate marketing plans
  • Received, unpacked, and stored incoming merchandise according to company guidelines
  • Processed returns and exchanges efficiently according to company policy
  • Moved heavy merchandise around the store using pallet jacks or other necessary equipment
  • Stocked pallets throughout the shifts to keep warehouse clean, maintained and organized
  • Pushed carts and loaded customer purchases into vehicles
  • Replenished items to maintain stock availability
  • Stocked shelves with new merchandise and checked for outdated or damaged items
  • Part time still in high school

Education

High School Diploma -

Caroline High School
Milford, VA
06.2018

Skills

  • Work planning
  • Operating machinery
  • Framing
  • Operating tools
  • Always willing to learn more
  • Project scope
  • Quality assurance and control
  • Project Planning
  • Commercial construction experience

Certification

Osha 10

Activities

  • Always on the go wanting to build projects outside of work
  • Being around family and helping them out with anything they need

Timeline

Project Manager

Wade Homes
11.2023 - Current

Electrical Apprentice

MC Dean
07.2022 - 11.2023

Laborer

Caroline of Virginia
10.2020 - 07.2022

Laborer

Green River Enterprises
12.2018 - 10.2020

Grocery Stocker

Giant Food Stores
10.2016 - 12.2018

High School Diploma -

Caroline High School
Travis Compher