Summary
Overview
Work History
Education
Skills
Timeline
Generic

Wyatt Wilkins Jr

Hampton

Summary

Focused Pipe Layer proudly offering a great attendance record and a background assembling pipes. An adaptable employee willing to follow instructions to ensure safety for the entire work crew. Offering problem solving and time management skills.

Overview

9
9
years of professional experience
2016
2016
years of post-secondary education

Work History

Pipe Layer /General Laborer

Daher Construction
Fort Walton Beach
08.2024 - Current
  • Installed underground piping systems following safety protocols and project specifications.
  • Collaborated with team members to ensure accurate pipe layout and alignment.
  • Operated heavy machinery for trenching and backfilling tasks effectively.
  • Maintained tools and equipment to ensure optimal performance and safety standards.

Pipe Layer /General Laborer

Tidewater Utilities Inc.
Suffolk
02.2022 - 07.2024
  • Installed underground piping systems following safety protocols and project specifications.
  • Collaborated with team members to ensure accurate pipe layout and alignment.
  • Operated heavy machinery for trenching and backfilling tasks effectively.
  • Maintained tools and equipment to ensure optimal performance and safety standards.
  • Installed pipes using hand tools, power tools and heavy machinery.

Concrete Finisher

Newport News Public Works
Newport News
04.2018 - 02.2022
  • Finished concrete surfaces to ensure smoothness and durability.
  • Operated tools like trowels and floats for precise finishing.
  • Read blueprints to understand project specifications and requirements.

Loader and Unloader

Walmart Distribution Center
Williamsburg
11.2016 - 03.2018
  • Loaded merchandise onto trucks for timely distribution.
  • Unloaded incoming shipments and organized products in the warehouse.
  • Operated forklifts and pallet jacks to move heavy items safely.

Education

Bethel High School
Hampton , VA

Skills

  • Installing piping systems
  • Trench excavation
  • Machinery operation
  • Project specifications

Timeline

Pipe Layer /General Laborer

Daher Construction
08.2024 - Current

Pipe Layer /General Laborer

Tidewater Utilities Inc.
02.2022 - 07.2024

Concrete Finisher

Newport News Public Works
04.2018 - 02.2022

Loader and Unloader

Walmart Distribution Center
11.2016 - 03.2018

Bethel High School
Wyatt Wilkins Jr